News

Stand up and be counted - it's not too late!

December 21, 2011 | Smart Meter & TOU

We have received 19 responses to the MDM/R Outage Recovery Questionnaire. It is important that we consider the needs of all LDCs in our assessment of the responses, so we strongly encourage those who have not responded to do so by the end of January 2012.   

Plan Ahead! New MDM/R functionality is coming.

December 15, 2011 | Smart Meter & TOU

Calculative Reads Equality Adjustment functionality will soon be coming to the MDM/R. Take this opportunity to be prepared and learn more about how this functionality will affect your systems and business process development.

IESO Receives Clean MDM/R Operations Audit

November 21, 2011 | MDM/R Operations

The IESO received a clean audit in an external audit that examined the Meter Data Management and Repository’s (MDM/R) operations, processes and procedures. Read more...

MDM/R Outage Recovery Questionnaire

November 8, 2011 | MDM/R Operations

To better serve our MDM/R users, we are always trying to learn more about how LDCs have integrated the MDM/R into their systems and business processes. To that end we are asking all LDCs to consider the impact an MDM/R outage would have on their business and complete a questionnaire providing that information.

Release 7.2 Testing Scenarios: Walkthrough Sessions

October 6, 2011

Project Managers at the Smart Metering Entity are organizing multiple webinar sessions to conduct walkthroughs of the LDC Required and Recommended Release 7.2 Testing Scenarios.

Visit the Transitioning to R7.2 Page!

August 29, 2011 | MDM/R Operations

Visit our new EnergyIP R7.2 transition page through the R7.2 quick link to the right. Although the implementation of Release 7.2 is months away it's time to prepare for your transition.  This new page provides you with the resources you need to be R7.2 certified.

Technical Document Revisions Support EnergyIP Release 7.2

July 26, 2011 | Smart Meter & TOU

New versions of the MDM/R Technical Interface Specifications and the MDM/R VEE Standard for the Ontario Smart Metering System have been released to support the changes made to EnergyIP R7.2.

SME Offers Workshop to Support EnergyIP R7.2 Transition

June 29, 2011 | MDM/R Operations

LDCs along with their agents and software providers are invited to attend a workshop to support the transition to EnergyIP Release 7.2. There are two dates to provide options for all to attend: July 13th and July 27th. 

MDM/R Technical Interface Specifications Version 3.3

June 6, 2011 | MDM/R Operations

MDM/R Technical Interface Specifications Version 3.3 has been posted on the SME website including Sample XML files for the new Billing Service Standard Interface and Data Precision Upgrades.   

SME Technical Bulletin #2: Unwinding Crossed Meters

May 24, 2011 | MDM/R Operations

The Smart Metering Entity is continuing its series of Technical Bulletins with a new bulletin about how to unwind crossed meters.

MDM/R Operations Working Group Teleconference June 7th

May 11, 2011 | MDM/R Operations

The MDM/R Operations Working Group will hold a one-hour teleconference June 7 at 11am as part of their regularly scheduled meeting. All LDCs are invited to join the conference.

SME Introduces SME Quick Take Series

April 27, 2011 | MDM/R Operations

The Smart Metering Entity (SME) has introduced an SME Quick Takes series to address Meter Data Management and Repository (MDM/R) topics that are new or of general interest for its stakeholders.

Half Day LDC Workshop - MDM/R Measurement Canada 2011 Solution

April 18, 2011 | MDM/R Operations

MDM/R Measurement Canada 2011 Solution and interim update to the technical interface specifications for the new MDM/R Billing Service Standard XML Interface presented during the April 14th LDC Workshop.

MDM/R Operations Working Group Meetings to Include One-Hour Teleconference for All LDCs

March 23, 2011 | MDM/R Operations

The MDM/R Operations Working Group will hold its first teleconference for all LDCs during its next meeting April 12.

SME Introduces Technical Bulletin Series

March 16, 2011 | MDM/R Operations

Bulletins review MDM/R topics that are new or of current interest to LDCs

SME and MDM/R Vendors Complete Latest System Upgrade

March 16, 2011 | MDM/R Operations

Upgrade supports continued time-of-use billing implementation across the province and delivers additional performance improvements

Weekly MDM/R Enrolment Update

March 7, 2011 | MDM/R Operations

LDC enrolment and testing activity as of March 4.

Weekly MDM/R Enrolment Update

February 28, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Feb. 25.

TOU Rollout Brings New Considerations for Merging LDCs

February 24, 2011 | Smart Meter & TOU

LDCs that are undergoing or considering mergers are being faced with a number of new considerations as they rollout smart meters and TOU rates. 

Weekly MDM/R Enrolment Update

February 22, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Feb. 18.

Weekly MDM/R Enrolment Update

February 14, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Feb. 11.

OEB Grants the IESO Five-Year Smart Metering Entity Licence

February 10, 2011 | Policy & Governance

The OEB has granted the IESO the Smart Metering Entity (SME) licence for a five-year term to January 2016.

Weekly MDM/R Enrolment Update

February 7, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Feb. 4.

Weekly MDM/R Enrolment Update

January 31, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Jan. 28.

Weekly MDM/R Enrolment Update

January 24, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Jan. 21.

Get a Customized Version of “Time-of-Use Rates at Work”

January 20, 2011 | Smart Meter & TOU

Time-of-Use Rates at Work,” the IESO’s online tool targeted toward small businesses, is available for local distribution companies (LDCs) to customize, brand and integrate on their websites. Contact the IESO’s Corporate Communications team to obtain an LDC-specific version of the site. 

IESO Receives Second Clean MDM/R Operations Audit

January 18, 2011 | MDM/R Operations

The IESO received another clean audit in an external audit that examined the Meter Data Management and Repository’s (MDM/R) operations, processes and procedures. 

Weekly MDM/R Enrolment Update

January 17, 2011 | MDM/R Operations

LDC enrolment and testing activity as of Jan. 14.

Validation, Estimation and Editing Standard Updated

January 13, 2011 | MDM/R Operations

The SME has updated the Validation, Estimation and Editing (VEE) Standard. Visit the Design and Standards page to review the latest version.

SME Weekly MDM/R Enrolment Update

January 13, 2011 | MDM/R Operations

The number of smart meters enrolled in the Meter Data Management and Repository (MDM/R) surpassed the two million mark in December, reflecting a significant increase in LDC enrolment activity in 2010. In light of LDC efforts, this website will provide weekly updates about MDM/R enrolment and testing activity.

Championing the Transition from Within

December 14, 2010 | Smart Meter & TOU

An interview with the managers leading Veridian’s smart metering and TOU rollout

MDM/R Guide Revised to Include More Details About the Self-Sertification Process

December 9, 2010 | MDM/R Operations

The SME has updated the MDM/R testing and cutover guide to include more details about the sample test data LDCs should submit with their Self-Certification for Enrolment Testing form. 

SME Launches MDM/R Service Desk and Self-Service Portal

December 1, 2010 | MDM/R Operations

The Smart Metering Entity has launched a new online Meter Data Management and Repository (MDM/R) service desk and self-service portal to further enhance its customer service and MDM/R support capabilities. As a result of the change, effective Dec. 1, a new MDM/R support contact email, mdmrsupport@service-now.com, should be used.

IESO Receives Clean Audit for MDM/R Operations

November 16, 2010 | MDM/R Operations

An external audit of the IESO’s Meter Data Management and Repository (MDM/R) operations processes and procedures was recently completed with the organization receiving an unqualified opinion for the audit period April 1, 2010 to Sept. 30, 2010. 

LDC Update: Waterloo North Hydro Completes System Integration Testing Ahead of Schedule

October 13, 2010 | Smart Meter & TOU

As a result of its Smart Metering team’s preparation and vendor engagement strategy, Waterloo North Hydro has completed System Integration Testing (SIT) ahead of schedule and has moved forward with Qualification Testing (QT).

IESO Launches Online Tool Targeted Toward Small Businesses on Time-of-Use Rates

October 13, 2010 | Smart Meter & TOU

The IESO recently launched a new online tool designed to help small business owners understand Time-of-Use (TOU) rates. “Time-of-Use Rates at Work” allows business owners to input basic information about their business’ electricity use to build a load profile. The objective of the tool is to get them thinking about their energy use and understand how their consumption profile will impact their costs.

LDC Update: Hydro One Brampton Makes the Most of MDM/R Unit Testing to Complete Enrolment

October 13, 2010 | Smart Meter & TOU

The SME has also released a Recommended MDM/R Unit Test Scenarios guide in recognition of unit testing’s importance to LDCs and in an effort to prepare them for MDM/R integration.

The SME will hold live teleconference to review new MDM/R billing service standard interface

September 28, 2010 | MDM/R Operations

The SME will hold a one day workshop on Oct. 5 at the Toronto Congress Centre to review the recently introduced MDM/R Billing Service Standard Interface Request and Response, which is being developed to support Measurement Canada’s requirement to include cumulative register reads from smart meters on residential customer bills. Due to the overwhelming demand, a live teleconferencing option will also be available.

Smart Meter Data Submission Guidelines Designed to Ensure Long-Term MDM/R System Efficiency

September 10, 2010 | MDM/R Operations

The SME is encouraging Local Distribution Companies (LDCs) to follow specific Meter Data Management and Repository (MDM/R) data submission guidelines to streamline related procedures and ensure their smart meter data is processed by the MDM/R efficiently and as scheduled. 

MDM/R Operations Working Group Established

September 10, 2010 | MDM/R Operations

A Meter Data Management and Repository (MDM/R) Operations Working Group has been established to represent the interests of MDM/R service recipients. 

MDM/R Update from the SME

September 3, 2010 | MDM/R Operations

On Aug. 18, 2010, the Toronto Star ran the first of several articles reporting on the government’s Smart Metering Initiative (SMI) and the Meter Data Management and Repository (MDM/R). A focus of the article was that time-of-use (TOU) bills in Ontario were inaccurate and needed to be “fixed." This is not the case. These are not problems of accuracy with the meters or with the processing within the MDM/R and they do not result in systemic overcharging or undercharging. 

Jumping in Head First

September 7, 2010 | Smart Meter & TOU

Ron Brajovic, Milton Hydro's  Manager of System Planning and Reliability, says the LDC has benefitted from the Smart Metering Initiative

SME website redesign provides LDCs with easy access to information

September 7, 2010 | MDM/R Operations

The IESO has redesigned its Smart Metering Entity (SME) website to support the electricity industry as it rolls time-of-use rates (TOU) across the province. The website is among several communications, customer service and operations programs the SME introduced to assist Local Distribution Companies with MDM/R integration and the achievement of Smart Metering Initiative targets.

Ontario's Smart Meter Network On Track

August 29, 2010 | Smart Meter & TOU

More than 1.5 million meters are communicating with the province's Meter Data Management Repository (MDM/R), representing a significant step forward in the province's Smart Meter Initiative. As more and more LDCs complete their smart meter infrastructure build outs, they begin the process of connecting their smart meters to the MDM/R, so that it can receive consumption data from these meters, bundle it and then send it back to the LDC for billing.